INFORMATION AS REQUIRED UNDER SECTION 217(1)(e) READ WITH COMPANIES (DISCLOSURE OF PARTICULARS IN RESPECT OF BOARD OF DIRECTORS) RULES, 1988
 
I. CONSERVATION OF ENERGY:
(A) Energy conservation measures taken :
  Installed variable frequency drives on cooling towers and mist condensers in evaporators. (Rayon & T.P. Sections). Installed Roller Press and HR-Separator for Cement Mill-I, XRD and XRF for quality control, curing water tank for temperature control for mould testings in laboratory, Coal integration from Line-4 to Line-1 to reduce down time, Pre-heating System for the Kiln Burner Pipe at Line-3 & Line-4. Reduced the number of Raw Meal silo aeration blowers from three to two at Line-3 & 4 and rerouting of material collected at Bag House of Cement Mill-4 to Cement Silo leading to increase of mill production. (Vasavadatta Cement Section). Installed latest energy efficient Cooler by replacing the existing Kiln-2 Cooler. Reduction of pressure drop of Kiln-2 pre-heater by 100 mm and Kiln-1 "C" line number 2 cyclone by 50mm and the fugitive dust emission in Cement Mill and coal crusher. (Kesoram Cement Section). Installed variable frequency drives in various cooling water pumps. Condensate recovered from curing process of Motor Cycle plant, Chilled water supply made auto On/Off with line running feedback in Dual Extruders. Chilled water return taken from plant equipment through over head return line in close loop. Suction line increased of all utility pumps. Condensate recovered from tube plant equipment. L.P. air used in place of M.P. air for fluidization in Banbury and idle running of main motor stopped by interlocking with batch loading. (Tyre Sections).
(B) Additional investment proposals, if any, being implemented for reduction of consumption of energy :
  Installation of Hydraulic system for washing carriers to save compressed air, Homogenizers for dissolvers and Cables in place of bus-bars in CS2 furnace. (Rayon & T.P. Sections). Installation of Hot Disk at Line-3 Preheater, P-Fister pump for coal dosing at Line-2, Roto Scale for Line-1 Kiln feed, replacement of Cooler at Line-1&2, ESP at Line 1&2 with RABH, ESP of Cement Mill-1&2 with Bag House. Utilization of Hazard Waste for coal firing and carbon firing in pre-heater to reduce coal consumption. (Vasavadatta Cement Section). Installation of high efficiency fan, high efficiency cyclones in Cement Mill-3, energy efficient compressors and conservation of coal by utilizing the hazardous waste. (Kesoram Cement Section). Installation of high pressure pumps for oil and alternator cooling system in TG, low pressure pump for de-super heater in TG, VFD in crackers mills, high pressure & high flow pumps for boiler feed water, M.P. air 5 Kg/cm2 in place of 7 Kg/cm2 in plant equipment except in Banbury & tyre building machines. Recovering hot water from curing presses. (Tyre Sections).
(C) Impact of measures at (a) & (b) above for reduction of energy consumption and consequent impact on the cost of production of goods :
  Reduction in consumption of coal and electricity per unit of production in general was witnessed.
(D) Total energy consumption and energy consumption per unit of production as per Form "A" of the Annexure in respect of industries specified in the Schedule thereto.
 1   2   3   4   5 